Key takeaways
- An empty mowing crew seat lowers how many properties you can commit to, long before payroll shows it.
- About 54 percent of contractors in Aspire's 2026 report list recruiting and retaining staff as a top business risk.
- LMN's 2023 survey found 93 percent of landscapers report difficulty hiring enough crew to finish jobs.
- Count declined bids and late starts from last season before you choose a fix.
- A robotic mower can take the mowing pass on some lots, but only after a site assessment shows the lot fits.
Why does one open crew seat cap your contract count?
One open seat on a mowing crew does not just slow the day. It sets a ceiling on how many properties your company can commit to, because a bid is a promise about start date, visit frequency and crew size. A crew short one person cannot honor that promise on every route, and the cost rarely appears as a line item. It shows up as a bid you never answered, a start date pushed back two weeks, or a property quietly dropped from the schedule.
The labor data points the same way. According to Aspire's 2026 Commercial Landscape Industry Report, fielded by Thrive Analytics with 1,015 commercial landscape contractors polled May 2 to May 23, 2025, about 54 percent of contractors list recruiting and retaining staff as a top business risk for 2026. Aspire sells landscape software, so treat these figures as vendor reported, though the sample is large.
LMN's 2023 survey of about 500 landscapers found 93 percent report difficulty hiring enough crew to finish jobs, with the worst strain in busy seasons. That number measures struggle, not a count of open positions. It tells you the pressure is common, not how many seats you are missing.
What do the hiring numbers actually measure?
Read the surveys closely before you lean on them. LMN's 2023 State of the Industry report says 51 percent of respondents could not find or hire enough staff to fill vacancies, down from the prior year. That figure and the 93 percent describe distinct things, so they should not be averaged or swapped.
Aspire approaches the question from another angle. In its 2025 edition, 51 percent of respondents cited staffing as a significant risk to meeting yearly goals. The material I could confirm gives no hiring-volume count and no time-to-fill figure for mowing crews, which is the reason to measure your own.
Wage responses show what contractors are doing about it. Aspire reports about 70 percent of respondents plan to raise wages to keep employees in 2026, and about 44 percent of those plan increases of at least 4 percent. A raise helps retention. It does not refill a seat by next Monday.
How one empty seat shrinks a bid calendar
A mowing crew's capacity is a calendar, not a headcount. Each property takes a set window of crew time, and the truck, mower and edger only earn their keep when enough people are working them. With one seat empty, the crew may still show up, but it cannot hold the same route density, so the stops at the end of the week slide into the next one.
That is why the loss is not one for one. A bid written for a full crew assumes certain stops per day. A shorter crew can drop below that without anyone noticing until the schedule breaks. Spring is when this bites hardest, because new contracts and seasonal starts stack onto the same open seat.
- Bids declined because the start window collides with a route already at capacity.
- Start dates pushed back when a new property joins a full route.
- Trim and edge work pushed out, so clients notice the drop in finish quality first.
- Callbacks for missed visits, which eat the hours you were trying to save.

How do you count the sites you could not cover last season?
Before you change anything, count the damage. Pull last season's bid log, your declined or unanswered proposals, and every start-date change. Most operators find the number is larger than they remember, because the misses were spread across many small decisions rather than one bad week.
Keep the reasons honest. A bid lost on price is one problem, and a bid lost because the crew had no room is another, and only the second is a staffing problem.
- List every bid you did not answer, with the week it arrived.
- Mark each start date that moved, and write the reason beside it.
- Note every property cut or reduced to a lower visit frequency to fit the crew.
- Compare the properties run per day when fully staffed with the count on days a seat sat empty.
- Total the open-seat weeks so you can weigh the loss against the cost of a fix.
Which fixes match a capacity gap?

Once you have the count, the options sort themselves. Hiring and raises fix the seat itself, but they take time and the labor pool is tight. Moving hours from low-value tasks onto the mowing route gives a faster, partial answer. Robotic mowers add capacity on lots that suit them, and only those lots.
Robotic mowers depend on boundary mapping, charging access and terrain the unit can handle. Trimming, edging and obstacle work still need people, so a robot relieves the mowing pass, not the whole crew. Test one or two suitable properties before you move a full route onto automation.
What does a site assessment settle for a mowing operator?
A site assessment is where a robot decision should start. For a mowing operator that means checking slopes, cart paths, drains, charging access and the boundaries a unit would need. If a property does not fit, the assessment should say so before any cost is discussed.
Service Robot Co. is a full-service commercial robot integrator for US businesses. We pick robots across manufacturers, then finance, deploy, integrate, train and service every unit through a nationwide US engineer network. Our offer is a lease: a 3-year lease with one fixed lease quote, given after a site assessment, so the cost is clear before you commit a route.
What should change before next season?
Start with the count from last season. If declined and delayed bids cluster in certain weeks, the fix is scheduling and staffing for those weeks. If they cluster on certain properties, the fix may be a pilot on the lots that suit automation, or a decision to stop bidding those sites at the same frequency.
Avoid changing everything at once. Pick one route, measure the start dates and bids it recovers over a season, and expand only when the numbers hold. A fully staffed crew on fewer, well-scheduled routes often wins more renewals than one stretched across every bid.

Frequently asked questions
Want a robot working for you?
Tell us the job and the site. We will recommend the robot, quote the lease, and keep it serviced.
Sources
Service Robot Co. is not affiliated with, sponsored by, or endorsed by the companies mentioned in this article.


