Skip to content

Trends & data

VA's Mixed Robot Results: What Idle Units Teach Operators

VA's early robot rollout shows idle units and staff chasing robots. Learn why utilization beats unit count and which weekly measures catch idle time early.

By Aaryan Agrawal6 min read
Empty hospital hallway with polished floors and overhead lights leading to patient rooms.
Photo: Manuel Nielsen

Key takeaways

  • Unit count shows what was deployed, not what the robots actually did.
  • VA's early uses reported mixed benefits, with staff chasing wayward robots and some runs missing their destinations.
  • Measure active hours against scheduled hours every week, per unit and per shift.
  • Idle time shows up first in staff interventions and idle minutes, not in the unit count.
  • Purpose-built sites with trained staff are the clearest model for high utilization.

Does the number of robots decide whether one earns its place?

No, not on its own. A March 2026 Nextgov report found that VA's early robot uses have shown mixed success, though excitement among staff remains. The sites reported 121 deployed robot uses: 37 delivery robots, 35 for pharmaceutical mixing and packaging, and 31 for facility cleaning services.

Those counts describe deployment, not work done. Follow-up visits to a subset of facilities found mixed benefits, with staff spending time chasing wayward robots and some tools failing to carry medications to their intended destinations. A unit that sits waiting, drifts off route or needs retrieving adds staff load and adds no capacity.

The short answer for operators: a robot earns its place through utilization, meaning the share of scheduled work a unit actually completes, checked every week. Unit count tells you what was deployed. Utilization tells you what it did.

What is verified about idle units, and what is not?

The primary Nextgov coverage describes staff time lost to chasing robots and tools that missed their destinations. I could not find a utilization percentage, an idle-unit count or a per-unit cost for VA robots, so none appears here.

The idle claim comes from a secondary source. Pulse Healthtech summarized the coverage as saying delivery, pharmacy and cleaning robots dominate usage, and that many units sat idle or were misdirected. That detail was not confirmed in the primary report, so treat idle time as a pattern to check in your own logs, not as a measured VA figure.

Why does a purpose-built site outperform a bolted-on one?

Houston DeBakey VA Medical Center was described as the most successful implementation. According to the Nextgov coverage, the site was purpose-built for robots and its staff were trained to maintain them.

That pairing points at what drives utilization. Route design, elevator access, charging locations, door hardware and a clean handoff at each end of a run decide whether a unit can keep working. Staff who know how to recover a stuck unit keep it in service. Where corridors were built for carts and no one is trained on recovery steps, the usual result is more chasing than delivering.

Hospital elevator lobby with wide doors and clear floor space, where staff move supplies between floors.
Photo: Jakub Zerdzicki

Where does idle time hide on a hospital floor?

Hospital supply cart parked beside a nurses station, with staff stopping to move items by hand.
Photo: Dalila Dalprat

Idle time rarely shows as a red light on a dashboard. It hides in a few predictable places, and each one looks ordinary on a single run while adding up across a week:

  • A unit waiting at a closed door, elevator or handoff point with no staff member to take the load
  • A unit recharging while a run sits queued, because charging sites sit far from the busiest corridor
  • A misrouted tray or medication run that has to be retrieved and sent again
  • Staff walking the building to find a unit that stopped mid-route
  • Shifts in which a unit stays powered and scheduled but has no assigned task

Which weekly measures catch idle time early?

A weekly review can catch idle time within days if you compare the right measures against a baseline set in the first two weeks. Track these six measures per unit and per shift:

  • Active hours against scheduled hours, the basic utilization ratio
  • Tasks completed against tasks assigned, which shows whether runs finish
  • Idle minutes on shift with no queued task
  • Staff interventions, counting each chase, rescue or manual restart
  • Misdirected or undelivered runs, logged by destination
  • Charging time as a share of shift time, to show whether charging starves the fleet

How should a site decide how many units to add?

Add units when the measures show the current fleet finishing its assigned work with few interventions, not when a unit count looks attractive on a proposal. Read the measures together. High active hours alongside many staff interventions means a unit is working hard and costing attention. Low active hours with few interventions often means thin demand or poor routing, which points to the workflow rather than the robot.

Procurement is moving in a similar direction. A cleat.ai listing describes a VISN 1 solicitation for an enterprise-wide robot delivery system, including a blanket agreement for autonomous mobile robots to replace an end-of-life fleet. A second listing describes five FDA-cleared autonomous robots for transporting non-controlled medications at the West Los Angeles campus. Both were read as posted and not verified in full, but they show large systems planning fleets as replacement and standardization programs, with medication transport described separately from general delivery.

Where does a robot lease fit into keeping utilization high?

Service Robot Co. is a full-service commercial robot integrator for US businesses. We pick robots across manufacturers, then lease, deploy, integrate, train and service each unit through a nationwide US engineer network. Our robot lease runs three years, with one fixed lease payment quoted after a site assessment, so the route, charging and handoff questions above get answered before a fleet size is set.

Training is the part the Houston example points to. Staff who can recover a unit and clear a fault keep a fleet working, and a clear service path stops repairs from stalling a route. Ask any integrator, including us, how fault recovery, on-site dispatch and remote triage work before you sign, and ask for the weekly reports that will show utilization.

Frequently asked questions

Not by itself. The VA figures count 121 deployed uses, which shows how many units were put into service, not how many runs they completed. Utilization, measured as active hours against scheduled hours, is the better test of whether a fleet earns its place.

Want a robot working for you?

Tell us the job and the site. We will recommend the robot, quote the lease, and keep it serviced.

Sources

Keep reading

Free site assessment. We tell you what actually works before you spend a dollar.