Skip to content

beverage can manufacturing plants

Autonomous Forklift vs Forklift Operator: Beverage Can Plants

Autonomous forklift vs forklift operator at beverage can plants: where fixed pallet routes fit, where people still win, and how to start safely.

By Aaryan Agrawal

Wide view of a large industrial warehouse interior with pallets stacked along open floor aisles.
Photo: Pixabay

The short answer

For most beverage can plants, the autonomous forklift vs forklift operator choice comes down to whether the pallet moves repeat. An autonomous forklift fits when loaded pallets travel the same mapped routes between production lines and storage and the overnight operator shifts are hard to fill. It does not fit when pallet patterns change every shift, when trucks must be unloaded by hand, or when a person has to judge each move.

Key takeaways

  • Fixed, repeatable pallet routes between lines and storage are the strongest case for an autonomous forklift.
  • Truck unloading, uneven loads and routes that change every shift still need a trained person.
  • The labor case rests on hard-to-fill overnight shifts, and the answer is fewer staff, never zero staff.
  • Keep at least one operator on the night roster for exceptions, dock work and recovery after a stop.
  • Start with a free site assessment, one mapped route and one leased unit before scaling up.

Autonomous forklift vs forklift operator: which fits a beverage can plant?

A beverage can plant runs one of the more repeatable materials flows in manufacturing. Sheet stock, empty can bodies, finished cans and packaging move from line to line and from line to storage on a schedule that changes little from week to week. That repetition is what an autonomous forklift is built for. It carries loaded pallets along a mapped route, stops at fixed points and returns on its own.

The robot makes sense when three things are true. The moves run on the same route most shifts, the loads come from a small set of pallet types, and the overnight shift is the one that is hard to staff. It makes less sense when moves change daily, when most of the work is unloading trailers, or when the floor has no clear aisles and too much foot traffic.

Treat the choice as a route question first and a headcount question second. If the route is stable, the robot can take the repetitive share of the night work. If it is not, an experienced person on a forklift will still be faster and more careful on the floor.

What does a forklift operator actually do in a shift at a can plant?

A forklift operator at a can plant is rarely only driving. The shift usually includes pulling full pallets from a line outfeed, moving them to staging or storage, bringing empty pallets and packaging back to the line, and clearing lanes when a pallet is dropped or a wrap comes loose. Most of the day is short moves with waits between them, which is why the work looks slow to outsiders and feels busy to the people doing it.

Operators also make calls a fixed route cannot. They decide which pallet to pull first when two lines back up, reroute around a spill or a stopped truck, check that a load is stable before a long move, and hold damaged pallets before they reach a rack. Those calls are why plants keep experienced operators even when a line runs automatically.

Operator work also includes basic equipment checks at the start of a shift, such as battery or fuel level, forks, tires, horn and lights. A plant that wants a fair comparison should log its own move list for one normal week before deciding anything, because the list shows what the job actually is.

A worker moves stacked pallets along a warehouse aisle during a working shift.
Photo: Nikita Grishin

Which parts of the pallet work can an autonomous forklift take over?

The robot is strongest on moves that repeat. Loaded pallets going from the end of a filling or packing line to a staging lane, from staging to a storage rack or bay, and back along the same aisles are the core fit. Each move is predictable enough to map, and the stop points can be fixed at the line outfeed and at the rack face.

It is weaker where the path changes. Routes that cross busy foot traffic, pass a shared dock with uneven trailers, or depend on a person judging which pallet is ready are poor candidates for a fixed route. Those moves stay with people, and the plant should say so in the scope rather than hope the robot absorbs them.

  • Repeating loaded moves on a mapped route
  • Line outfeed to staging at fixed stop points
  • Staging to rack or bay trips on the same aisles
  • Not a fit: trailer unloading, mixed loads and open yard work

What can an autonomous forklift not do at a can plant?

Be clear about the limits. A robot cannot decide on its own that a pallet is unstable, that a load is badly built, or that a pallet with an unexpected drop should wait. It cannot read a hand signal from a supervisor, it cannot clear a conveyor jam, and it cannot work a trailer that is not level with the dock plate.

Routes need care too. Floors must be level, free of standing liquid and cracked joints, and aisles must stay clear of carts and stray pallets. Any pallet pattern that changes every shift forces remapping or manual overrides, and that slowly erodes the savings that justified the robot.

Plan for the moment the robot stops. A stopped unit can block an aisle until someone resets it, so the plant needs a trained person on call during the night shift and a clear way to route around the unit. That means fewer people on the roster, not no people.

Robot and operator, point by point
Night coverage

Autonomous Forklift

Runs fixed routes whenever a loaded pallet is ready, with no shift change

Forklift Operator

Covers exceptions and dock work, but needs breaks and cover

Route changes

Autonomous Forklift

Needs remapping when a route changes

Forklift Operator

Adjusts a route on the spot

Judging a load

Autonomous Forklift

Cannot judge whether a load is stable or badly built

Forklift Operator

Checks stability and holds a bad pallet

Truck unloading

Autonomous Forklift

Not a fit for uneven or hand-loaded trailers

Forklift Operator

Handles varied trailers at the dock

Recovery from a jam or spill

Autonomous Forklift

Stops and waits for someone to reset it

Forklift Operator

Clears the obstacle and reroutes

Long repeat runs

Autonomous Forklift

Same path and speed on every trip

Forklift Operator

Pace and attention can vary late in a long shift

Staffing

Autonomous Forklift

Does not need to be hired, but needs a trained person on call

Forklift Operator

Harder to fill for overnight shifts, as the labor section explains

How many people work these jobs, and how hard are they to fill?

A small group of factory staff in work clothing stands together on a production floor.
Photo: EqualStock IN

The wider labor market shows the pressure. According to the Bureau of Labor Statistics, about 6.92 million people were employed as hand laborers and material movers in 2025, and that group is projected to grow 4% from 2025 to 2035, which BLS describes as fast as average. The same projection lists about 904,200 openings each year.

The forklift group is tracked separately. According to the Bureau of Labor Statistics, 792,500 of the 867,700 material moving machine operator jobs in 2024 were industrial truck and tractor operators, and that group is projected to grow 1% from 2024 to 2034, which BLS calls slower than average. Warehousing and storage is the largest employer, at 36%. The two BLS pages use separate projection cycles, so their growth rates should not be compared directly.

Turnover data is thinner for hourly floor staff. A 2025 salary survey covered in materials handling trade press reported average turnover of 8.6% in 2024, down from 11.8% in 2023, but most of its respondents are salaried professionals, not forklift operators. A 2025 warehouse labor survey, which is vendor-reported, named forklift operators among the hardest roles to fill. This review could not verify public figures for overtime, sick days or night-shift hours for operators, so the plant should pull those from its own timekeeping.

How does the night team work with a robot?

The team design matters more than the robot itself. The usual pattern is one robot or a small fleet on the fixed routes, one trained operator on the night roster for exceptions, dock work and repairs, and a supervisor who can reset the fleet and reroute. The operator's time moves from repetitive trips to the exceptions the robot cannot handle.

Cross-training is the piece plants skip. Operators need to read fleet status, clear a stopped unit and report a damaged pallet. Maintenance staff need the battery and sensor routine. Without that, a single stopped robot can hold up a line while people work out what happened.

Expect the change to show up as a smaller night roster and fewer hard-to-fill shifts, not as an empty building. Keep at least one person who can run a truck by hand for the nights when a route is blocked or a unit is down.

How many hours does the robot take over in a week?

Plants usually ask for an hour figure first, and that figure should come from the plant's own timekeeping. The public data gathered for this page did not include verified shift-hour totals for forklift operators, so the table below lists the tasks instead of inventing hours. Fill in each row from your own move log.

Split the hours into three parts: repeat moves on fixed routes, moves that need judgment, and waiting time while a line clears or a route is blocked. Repeat moves are the robot's share. Judgment moves stay with people. Waiting time is where a robot can help, because it resumes the route as soon as the path is clear.

Is an autonomous forklift safer than a forklift operator?

The safety case is real but needs context. According to a material handling trade association's 2026 forklift safety summary, 84 workers died in 2024 in incidents involving forklifts, order pickers or powered platform trucks. That is a count across the whole category, not a rate for can plants, and it does not show how many of those incidents involved pedestrians.

Across all US work, the Bureau of Labor Statistics Census of Fatal Occupational Injuries, as summarized by a trade association, counted 5,070 fatal work injuries in 2024, down 4.0% from 5,283 in 2023. Transportation incidents made up 38.2%, or 1,937, of those deaths. Because transportation incidents make up such a large share, the controls that matter most are those that keep people away from moving equipment.

Safety on a robot route depends on the same basics as a manual route: separated walkways, marked stop zones and clear lighting. Check how the units stop when a person enters the path, and ask for that stop behavior in writing before any route is approved.

An open factory floor walkway lined with storage racks, with workers visible in the distance.
Photo: Yetkin Ağaç

How do you start an autonomous forklift project at a can plant?

Start with the route map, not a vendor list. Write down the top moves by volume, the pallet types, the stop points and the shifts that are hard to staff. A plant that can name those few things can judge fit quickly, and that is the information a site assessment needs.

We pick the right robot for the site, lease it through financing, deploy and integrate it, train the staff and service it nationwide. The lease payment comes in a quote after a free site assessment, where we map the route, check the floor and test the stop points before anything is committed.

Begin with one leased unit on one route, with go-live support and the night crew on site. Expand only after the route runs for a period you agreed on in advance, without manual overrides. Ask what happens when a unit is down, including how fast a technician responds and how a backup unit is covered.

Frequently asked questions

It depends on how repeatable the pallet moves are and how hard the overnight shifts are to fill. A plant with fixed routes and a hard-to-staff night shift has the strongest case. A plant with changing routes, heavy trailer unloading or uneven loads usually gets less from the same move. A free site assessment is the fastest way to test the question against your own floor.

Want an autonomous forklift at your beverage can manufacturing plant?

Tell us about your site. We will recommend the robot, quote the lease, and keep it serviced.

Sources

Free site assessment. We tell you what actually works before you spend a dollar.