Key takeaways
- The 2026 Belfry figures come from the event and its sponsor, so treat them as reported claims, not proven results.
- Reported fleet counts ranged from 15 to 18, and the course director cited 16 mowers in tournament week.
- Overnight passes free daytime crew hours, but a stopped mower stays unseen until someone arrives.
- Ask any supplier for its blade, calibration and fault-response routine in writing before you set a night window.
What overnight passes change for a course
An overnight fairway pass runs while golfers, carts and crew are off the course. The mower takes work that would otherwise sit in daylight hours, so the day team can spend its time on greens, bunkers and guest areas. That trade is the main reason clubs study night cutting.
The clearest recent example is the 2026 Husqvarna British Masters at The Belfry. The Brabazon Course hosted a celebrity pro-am on August 26, with championship play from August 27 to 30. Event and trade coverage reported robotic mowers running overnight fairway cuts through rain-affected conditions.
Treat those performance claims as event-reported, not independent data. Husqvarna became title partner of the event in January 2026, according to trade press, and most of the coverage traces back to the sponsor or to outlets repeating its releases.
How many mowers did The Belfry run?
The count depends on which source you read, and the gap is worth knowing before anyone quotes a number.
- The pre-tournament vendor release said seven CEORA units prepared the course, with an expanded fleet of 15 giving overnight support in tournament week.
- Belfry Director of Golf Courses and Estates Angus Macleod, in event-reported coverage, put 16 CEORA robotic mowers on overnight work in tournament week.
- A later Husqvarna post said 18 CEORA robots maintained the fairways overnight across build-up and the tournament.
Why the night window helps on wet turf
Macleod argued that the machines are significantly lighter than traditional fairway mowers, so they put less pressure on wet ground. He also said the team would not have had time to cut the fairways and finish other preparation without them. Both points are his, reported by the event, and neither is a measured turf result.
Coverage says the mowers kept cutting the championship fairways through prolonged thunderstorms and heavy rainfall. Rain is where daytime schedules break first. A pass that waits for dry weather can push crew work into the hours when play is already underway.
Moving that cutting into the night gives the day crew a steadier plan. A rain-soaked morning does not automatically take hours from the greens team. The trade-off is that the machines must keep running without anyone watching them.

What the player reaction does and does not prove
Players reportedly said they would not have known the fairways had been cut by robotic mowers. A staff member said the machines left very little visible marking. Both remarks were reported second hand, and they describe one high-profile event rather than a daily-play course.
The vendor says every machine is cleaned and calibrated, and its blades are changed daily. Ask for that routine in writing from any supplier, along with a clear answer on who responds when a unit stops at 2am.
A better test for your own course is the morning inspection, not the press release. Check stripe quality, edges and any marks on the turf before the first group arrives, and record what you find.
What a course should set up before a night window

A night pass is only as good as the checks around it. Four items matter most before the first run.
- No-go areas for bunkers, drains, cart paths and hazard banks, mapped and tested before the first night.
- A morning sign-off standard, with a named person who inspects turf and approves the handover to play.
- A written run log covering start and stop times, pauses and any blade or turf concerns.
- An alert route, so a stopped unit reaches a person before the first tee rather than after.
How Service Robot Co. fits a night fairway program
Service Robot Co. is an OEM-neutral integrator. We pick robots across manufacturers for the job, then deploy, integrate and train crews on them. Customers get equipment through a lease, on a 3-year lease with one fixed payment quoted after a site assessment.
We service every unit under RoboCare, our service plan, backed by regional service engineers in every state we service. One vendor covers the whole lifecycle, from mapping to fault response. We do not claim The Belfry results as ours. A site assessment is where we map a course and size a fleet against its real hours.
Frequently asked questions
Want a robot working for you?
Tell us the job and the site. We will recommend the robot, quote the lease, and keep it serviced.
Sources
- Golf Business News: Autonomous mowers help The Belfry maintain conditions through rain-affected Husqvarna British Masters (greenkeeping)
- Golf Business News: Autonomous mowers help The Belfry maintain conditions through rain-affected Husqvarna British Masters (sponsorship and events)
- Husqvarna press room: Automated robotic technology at the heart of The Belfry preparations for British Masters
- GolfShake: Autonomous mowers are being used to get The Belfry ready for the British Masters
- Landscape and Amenity: Husqvarna becomes title partner of the British Masters on the DP World Tour




