Skip to content

aluminum extrusion plants

How Autonomous Forklifts Can Benefit Aluminum Extrusion Plants

Autonomous forklifts can take billet and profile moves between press, cooling and storage off operator hours. See where they fit in an extrusion plant.

By Aaryan Agrawal

Wide view of a large industrial metal manufacturing hall with high ceilings and material stacked along the floor.
Photo: Daniel Dan

Key takeaways

  • Billet and profile moves between press, cooling and storage repeat every shift, which suits fixed robot routes.
  • Vendor-reported figures put travel time savings at 3 to 4 hours per eight-hour shift on indoor pallet moves.
  • Over 170 extrusion facilities operate in 36 states, so many plants share this same move pattern.
  • A robot covers the repeated runs while a smaller team handles loading, inspection and irregular moves.
  • Start with a free site assessment, then get a lease quote through financing.

How can autonomous forklifts for aluminum extrusion plants help?

Autonomous forklifts for aluminum extrusion plants take over the repeated moves that eat operator hours: billet from staging to the press loader, hot profile from the press exit to cooling, and cooled lengths from the run-out to the storage racks. Each robot follows a set route, so the same move happens the same way on every shift without an operator in the seat for the long, predictable runs.

The benefit is not that the plant needs fewer people. It is that experienced operators spend their hours on work that needs judgment, such as loading, inspection and handling unusual loads, while the robot covers the trips between press lines and racks that repeat all day. That is why fixed routes suit this kind of plant so well.

Below we look at the problem at these plants, where the hours go, how the robot works day to day, which areas it covers, how it shares the floor with staff, what drives the savings, what it cannot do, and how to get started.

What do material moves cost an extrusion plant today?

An extrusion line runs on a rhythm. Billet is staged, pushed through the press, pulled off the run-out, cooled, stretched, cut, aged and stacked. Between those steps material has to move, and in many plants the same operators who drive those moves are needed at the press, the saw or the pack line. When a driver waits on a billet or a cooled length, the line can wait too.

The scale of this is larger than many people assume. According to the Aluminum Extruders Council, over 170 facilities operate in 36 states, and the council also counts over 40 remelt facilities that turn scrap into extrusion billet. The Aluminum Association's directories, dated April 2017, counted 204 extrusion plants running 538 presses. A third-party industry directory with no stated year lists 29,679 employees under the aluminum rolling, drawing and extruding code.

Billet supply is also moving. According to a metals market report carried by Aluminum Market Update, a large producer plans to close its remelt billet plant in Delhi, Louisiana in 2027, and the analysis puts that at about 5 percent of the producer's US remelt billet nameplate capacity. A plant that sources billet from many places can see its inbound flow change, so check your own inbound volume before you fix routes for the year.

Where do the hours go, and how much can a robot give back?

Operator hours at this kind of plant leak out through travel. A driver who spends a shift shuttling between the press exit, cooling, aging and storage is not running the saw or checking profile. The travel is the part you can measure, and it is where autonomous forklifts make the first change.

According to an automated forklift infographic from a global logistics provider, one robot can save 3 to 4 hours of traveling time per eight-hour shift for indoor pallet transport. That is a vendor figure for pallets, not extrusion billet, so treat it as a number to test on your own routes rather than one to plan around.

A vendor case study on an autonomous tugger, a separate vehicle type, reports 60 labor hours saved each week and 1.5 full-time roles redeployed to other work. The pattern is the same across vehicle types: hours return when the repeated run goes to a robot and staff move to work that needs a person.

How does an autonomous forklift work day to day?

Before the first shift, the robot is set up with its routes and the points it serves. Routes are fixed, so each move starts and ends at known places, such as a billet staging lane, a press loader, a run-out exit, an aging rack or a storage bay. Mapping the floor and setting those points is part of the site assessment and deployment work.

During a shift the robot works through its queue. It travels to the next pickup, confirms the load, follows its path and drops off. When a person or cart blocks the route, it is designed to stop and wait rather than push through. Staff watch the queue and clear anything that stays stuck.

Between shifts the robot charges and gets its routine checks, including battery, sensors and wheels. Those checks keep it on the same path day after day, which is what makes this work a good match for a machine that repeats the same moves every shift.

Which areas of the plant does it work in?

Autonomous forklifts for aluminum extrusion plants fit best in the zones where material moves along the same path each shift. In an extrusion plant that means the billet staging area, the press exit and run-out, the cooling and aging areas, the saw and stretcher area, the storage racks and the shipping dock. Each zone has its own rhythm, so the route plan has to match how that area actually runs.

We usually suggest starting where the moves are most frequent and most predictable, which is often the billet lane to the press and the run-out to the racks. Storage and shipping can come next, because finished bundles travel longer distances and wait for trucks. Outdoor yards and areas with heavy changing traffic are usually left for a later phase, once the first routes run cleanly.

How do the robot and existing staff share the floor?

A robot does not run the plant alone, and the plant does not need to be built around one. The robot takes the repeated runs, while a smaller team handles what it cannot, from loading and inspection to clearing a blocked route. Most operators stay on the floor, and what changes is how their shifts are spent.

Staffing is a real concern in this industry. According to the Aluminum Extruders Council, the industry is looking to expand its workforce, and the council runs an apprenticeship initiative and is a sponsor partner of a Manufacturing Institute program. A plant with open operator roles can use the robot to keep moves going while it recruits, rather than letting a single shift set the pace for the whole line.

Good deployments include training for the operators who work beside the robot, clear rules for who clears a blocked route, and a named contact for each shift lead. We deliver that training, along with deployment and integration and go live support, so the team is ready before the first full shift.

Workers walking along a clear aisle beside industrial equipment in a factory hall.
Photo: Tiger Lily

What drives the savings, and what should you measure?

Stacked cylindrical aluminum billets sitting in a plant storage area.
Photo: cottonbro studio

Savings come from hours, not from one headline number. The main driver is how many hours operators spend today on repeated moves between press, cooling and storage, and how much of that time a robot can take on fixed routes. Measure that before you talk about any return.

The vendor figures in this article give a range to test against. A travel time figure of 3 to 4 hours per eight-hour shift and a case study reporting 60 labor hours saved each week show how wide the spread can be. They are not promises for your plant, so the useful step is to time your own moves for a week and compare.

Other drivers include how often the press runs, how many racks and zones sit on the route, how many staff are on each shift, and how long a blocked route stays blocked. A site assessment captures those inputs and turns them into a quote. Any payment figure comes in that quote, not on this page.

What can an autonomous forklift not do?

A robot does not load a press, change dies, judge surface quality or decide when a profile is out of tolerance. It cannot read a load that needs a person to check it, deal with a pallet that arrives damaged, or handle a route that changes every hour. Those tasks stay with your team.

It also depends on the floor. Routes need clear lanes, consistent markings and a plan for doors, cross traffic and hot zones. Some moves, such as those into areas with uneven surfaces or frequent unplanned obstacles, may need a site change before a robot can run them. The site assessment tells you whether those changes are worth making.

Expect a tuning period after go live. Routes are often adjusted in the first weeks as the team learns where the flow really goes, so plan for that rather than expecting a finished route on day one.

How do you get started?

Manager reviewing layout plans on a factory floor before a project begins.
Photo: Pixabay

Start with a free site assessment. We walk the press house, cooling area, aging, storage and dock, map the routes, time the moves and note the hazards. From that we recommend the right robot for the site, the number of units to start with and the phases of deployment.

The robot is leased through financing, and the payment comes in the quote after the site assessment. We handle deployment and integration, train your staff and service the robot nationwide. Many plants start with one leased unit on a single route, then add units once the first route runs cleanly.

If you want to see whether these routes fit your plant, the next step is a conversation about your press schedule and storage layout. Bring your move counts if you have them, and we will do the rest of the measuring with you.

Frequently asked questions

Timing depends on the floor, the number of routes and how much mapping is needed. The site assessment comes first, then deployment and integration, then go live support as staff learn the routes. The schedule is set during the assessment, not promised on this page.

Want an autonomous forklift at your aluminum extrusion plant?

Tell us about your site. We will recommend the robot, quote the lease, and keep it serviced.

Sources

Free site assessment. We tell you what actually works before you spend a dollar.