Case studies
Documented, real-world robot deployments and the numbers they moved. Organizations are anonymized; figures come from public reporting.
How a Nuclear Plant Cut Condenser Inspection From Seven Shifts to Two7→2 Shift counta U.S. nuclear power station
How a Swiss PCB Overmolding Line Reached 5,000 Units Daily Above 95% Uptime5,000 Units per daya 40-employee precision plastics operation in Switzerland
How a Plastics Plant Cut Welding Cycle Time 23%23% Faster cyclea 95-employee injection-molding operation in North Carolina
How a European Switch Plant Raised Assembly Throughput Fivefold400% Productivity gaina low-voltage power-switch manufacturing operation in Europe
How a Precision Plastics Plant Reached 99.995% Robot Availability99.995% Availabilitya precision injection-molding plant serving regulated industries
How a Refrigerator Plant Lifted Test Productivity 68% With Cobots68%+ Test outputa refrigerator manufacturing plant in southern Brazil
Plantation Shutter Sanding Case Study: Cycle Time Cut More Than 80%80%+ Faster sanding cyclesa custom plantation-shutter manufacturer
How a Toilet-Seat Factory Increased Production Fivefold5× Seat outputa 380-employee sanitary-products manufacturer in Austria
How a Trailer Plant Cut Heavy-Part Forming from 5 Minutes to 15→1 min Cycle per parta U.S. commercial-trailer manufacturer
How a Tube-Bending Shop Cut a 2-Day Run to Four Hours4 hrs 1,500 partsa short-run metalworking shop in the United States
How a U.S. Die-Casting Plant Cut Hand Filing Up to 90%85-90% Less hand filingan automotive die-casting plant in Tennessee
How a Slovakian Vegetable Grower Cut Herbicide Use 86% With Vision Sprayers86% Herbicide cuta large Slovakian vegetable grower
How a Warship Tank Inspection Fell From 800 Hours to 50800 hrs Projected manuala government-operated replenishment vessel undergoing tank surveys
How Vision-Guided Nutplate Assembly Cut Cycle Time 40%40% Faster cyclean aerospace components supplier with high-mix assembly requirements
How an Animal-Litter Plant Raised Palletizing to 40 Tons a Shift~40 t Per shift nowan animal-litter manufacturing plant in Poland
How an Arctic LNG Plant Cut Inspection Rounds From 6 Hours to 45 Minutes6→45 min Per touran Arctic liquefied-natural-gas facility
How an Atlanta Parcel Hub Raised Sort Labor Efficiency 80%80% Labor efficiencya major e-commerce parcel distribution center in Atlanta
Body Shop Lifter AMR Case Study: Throughput Rises 12.5% at 99.4% Uptime12.5% Productivity gaina global automaker's body-shop operation
How an Engine Foundry Improved Productivity and Quality 50%50% Productivity gainan engine crankcase foundry in Germany
How an EV Filter Plant Cut Equipment Downtime Tenfold10× Less downtimea precision knitted-wire-mesh factory in North Wales
How an Indoor Theme Park Cut Ride Inspections About 90%~90% Time saveda major indoor amusement and water-park complex in Canada
How an Arizona Injection Molder Cut Operating Expense 40% with Machine Tending40% OpEx reductionan Arizona injection-molding manufacturer
How an Online Pharmacy Raised Sorting Productivity 30%30% Productivitya high-volume online pharmacy fulfillment center in Sweden
How an Austrian Cheese Cave Cut Derinding From 10 Minutes to 2 Per Block5× Faster cyclean organic cheese dairy with a 650-ton aging cave in Austria
Find the robot that fits your site.
Free simulation. We tell you what actually works before you spend a dollar.
