Case studies
Documented, real-world robot deployments and the numbers they moved. Organizations are anonymized; figures come from public reporting.
How an Airline-Parts Warehouse Reclaimed 36 Hours a Month with One AMR36 hr/mo Labor hours backan airline-parts warehouse with a 350-foot dispatch route
How an Apparel DC Cut Peak Shifts From 12-14 Hours to 8-970-75 Lines per hour peaka Canadian apparel distribution center
How a 500,000-Sq.-Ft. Build Freed 20 Documentation Hours Weekly20 hrs/wk Time reclaimeda general contractor documenting a 500,000-square-foot project
How a Battery-System Line Increased Throughput Sixfold With Robot Cells6x Throughputa battery energy-storage system manufacturing line in Europe
How a Finnish C&D Plant Reached a 71.8% Recovery Rate With AI Sorting71.8% Recovery ratea large combined construction-and-commercial waste facility in Finland
How a Northern California Vineyard Saved $24,000 in One Season With an Autonomous Tractor$24K Season savingsa commercial vineyard operation in Northern California
How a Casual-Dining Pilot Improved 82% of Guest Experiences82% Guests upa 10-location casual-dining restaurant pilot in the United States
How a Coffee Fulfillment Hub Tripled Picking Productivity at 625 Orders per Hour200% Productivitya high-volume coffee e-commerce distribution center in the Netherlands
How a Detroit Bakery Cut Depanning Scrap and Raised Sweet-Roll Throughput1.5% Scrap ratea high-volume commercial bakery in Detroit
How a Commercial Printer Cut Material Handoffs From 10-15 Minutes to 30 Seconds30 sec Per AMR handoffa century-old high-mix commercial printing plant
How a Dairy Cut Daily Feed Preparation from 2.5 Hours to 30 Minutes30 min Daily feed worka Scandinavian dairy farm operating three robotic milking boxes
How a Drug Plant Saved €60K by Cutting Tank Tests from 10 Hours to 410→4 hrs Five-tank roundan Austrian pharmaceutical manufacturer
How a Kentucky Faux-Stone Plant Cut Weekly Spray Downtime by 2.5 Hours2.5 hr Weekly downtime cuta faux-stone veneer and siding factory in Kentucky
How a U.S. Food Packer Hit 80 Bags per Minute and Freed 2-3 Operators80/min Bag pack ratea high-speed packaged-food production facility in the United States
How a German Furniture Plant Stacks 2,400 Board Parts Per Shift With a Robot2,400 Parts/shifta 50-employee custom furniture and shopfitting plant in Germany
How a High-Mix Electrical Plant Improved Productivity 20%20% Output gaina high-mix, low-volume electrical-products factory in Tennessee
How a Western State Transportation Agency Scanned a 300-Foot Culvert in Under 10 Minutes<10 min Scan completeda western U.S. state transportation agency
How a Hospital Saved 7,190 Driving Minutes on Lab Sample Runs7,190 Min saveda multi-building general hospital campus in Northern Europe
How a Hospital System Saved 5,390 Inpatient Days With Robotic Surgery5,390 Days saveda large public academic hospital system in Europe
Hotel Tower Fireproofing Robot Cuts Crew From Three Workers to Two30% Labor reductiona high-rise hotel construction project in Tokyo
How Autonomous Indoor Drones Mapped 80 Dam Compartments With 50% More Coverage50% More coveragea large hydropower dam with 80 internal compartments
How a Mine Cut Load-Out Bin Inspection Time 68% With a Wall Robot68% Time cuta bulk-material mining operation with four load-out bins
How a Bulk-Mining Operation Cut Ore-Bin Inspection Time 68% With Crawlers68% Time per bina bulk-mining operation inspecting four transfer-load-out bins
How a Japanese Modular Housing Plant Raised Daily Output From 55 to 65 Units65 Units/dayan 838,000-square-foot modular housing factory in Japan
Find the robot that fits your site.
Free simulation. We tell you what actually works before you spend a dollar.
