Case studies
Documented, real-world robot deployments and the numbers they moved. Organizations are anonymized; figures come from public reporting.
Blocklaying Robot Completes 1,573 Sq. Ft. of Walls in One Shift1,573 sq ft Wall area completeda production homebuilder in a master-planned Florida community
Airport Snow Removal Case Study: 357,500 Square Meters Per Hour357,500 m2/h Hourly clearing capacitya commercial airport 200 kilometers north of a Nordic capital
12-Turbine Wind Farm Reached 1.31 Blade Repairs Per Day1.31/day Blades repaireda 12-turbine wind farm in northern France
Pizzeria Case Study: Production Doubled With No Labor Change2x Production outputan independent high-volume pizzeria
Coworking Telepresence Robot Case Study: 144 Hours Reclaimed24/7 facility accessa 24/7 nonprofit coworking and makerspace with 220-plus members
Orchard Spraying Case Study: 40 to 50 More Acres Daily40 to 50 more acres per daya commercial orchard-spraying contractor
Autonomous Night Sweeping Used 15% of Heavy Sweeper Energy15% of heavy sweeper energya dense waterfront district in a Nordic capital
Rehab Case Study: 50% More Functional Progress Per Day50% more daily functional progressa 60-bed inpatient rehabilitation hospital in Ohio
Hospital IV Compounding Case Study: Nearly $700K in Six Months~$700K saved in 6 monthsa 650-bed academic medical center in Pennsylvania
Data Center Inspection Case Study: 51.6% Efficiency Gain51.6% Inspection-efficiency gainan operator managing three representative data centers
Port Case Study: Vacuum Mooring Cut Securing Time 71%71% mooring time cuta high-volume transshipment container terminal
Automotive Assembly Case Study: 90,000+ Components Moved90,000+ components moveda large U.S. automotive assembly plant
Sauce Plant Cuts 500 kg Batch Cook Time to Under 8 MinutesUnder 8 min 500 kg batch cooka family-owned sauce manufacturer modernizing a 30-year-old plant
Passenger Ferry Fleet Cuts Fuel Burn Up to 13% With Hull RobotsUp to 13% lower fleet fuel usea high-frequency passenger ferry fleet
Dental Lab Machine Tending Cut Production Cycle by 9 Hours9 hrs cycle time cuta 1,000-plus-employee dental laboratory in California
Rail Inspection Case Study: Over 2,400 Hours Down to About 70075% Inspection duration cuta 103.8-km, 56-station automated metro network
Almond Orchard Case Study: 89% Less Fruit Loss in Trial Blocks89% less fruit lossa commercial almond orchard participating in a multi-year field trial
Retail Case Study: 26x More Interactions Than a Tablet Kiosk26x more interactionsan airport chocolate retailer comparing a humanoid greeter with a tablet kiosk
Shipyard Blasting Case Study: 85% Less Manual Time Per Barge85% Less manual blasting timea Gulf Coast shipyard operating a 100-by-30-meter blast room
Autonomous Reach Trucks Raise Pallet Warehouse Efficiency 20%20% Efficiency increasea U.S. pallet warehouse operated by a global 3PL
Drywall Sanding Case Study: Up to 5x Productivity in Pennsylvania5x Higher L4-L5 outputa large commercial construction project in Pennsylvania
Tomato Pollination Robots Raised Yield Up to 20% in AustraliaUp to 20% higher yield vs manuala 10-hectare commercial tomato greenhouse in Australia
Grocery DC Back and Hip Injuries Fall 61% With Exosuits61% fewer back and hip injuriesone of a large grocery chain's biggest distribution centers
Submersible Transformer Inspection Saved Four Production Days4 days downtime avoidedan Australian silicon manufacturing plant
Find the robot that fits your site.
Free simulation. We tell you what actually works before you spend a dollar.