Case studies
Documented, real-world robot deployments and the numbers they moved. Organizations are anonymized; figures come from public reporting.
Museum Guide Robot Raises Information Recall From 42% to 73%42% to 73% information recalla major provincial museum in central China
Corporate Campus Delivery Robot Case Study: 17-Minute Average17 min average delivery timea 4.3-acre Silicon Valley corporate campus
Quartz Heat Treatment Cycle Time Falls 80% With Robots80% shorter cycle timea quartz-products factory in Vietnam
Pork Fulfillment Case Study: 50% Shorter Delivery Lead Time50% Shorter delivery lead timea European pork-processing and fulfillment center
Bridge Deck Rebar Work Cut Crew Hours and Duration by 34%34% fewer crew man-hoursa four-span bridge replacement project in western Pennsylvania
Trailer Unloading Case Study: Up to 700 Cases Per Hour700/hr Peak unload ratea North American contract-logistics operation receiving mixed cartons in trailers
Laundry-Handling Robots Prepare Up to 700 Towels per Hour700/hr Towels readied for foldinga 60-employee commercial laundry outside Munich
Retail Pharmacy Case Study: 75% Faster Online Order Separation75% Online-order separation timean independent retail pharmacy in Sao Paulo, Brazil
Meal-Portioning Cobots Raise Productivity 17% in Frozen Meals17% higher worker productivityan organic frozen-meal manufacturing plant in Northern California
Harvest-Assist AMRs Raise Grape Harvest Output 20 to 30%20 to 30% higher harvest outputa large California table-grape grower
High-Rise Facade Cleaning Cut From 374 Hours to 47374 to 47 h Total project timean 80-meter public-health office building with a 14,960-square-meter facade
Cement Plant Quadruped Inspection: 127 Downtime Hours Avoided127h downtime avoideda century-old Swiss cement plant with three mills across six floors
Airport Mobility Chair Case Study: 120 Passengers Assisted Daily120/day average passengers assisteda major U.S. international airport operating across two large concourses
Road Construction Case Study: 500 Hours Less Traffic Exposure500 hrs less traffic exposurea freeway-upgrade traffic-management contractor in Australia
Underground Gold Mine Surveys Ran 45% Faster With LiDAR Drones45% faster surveysan underground gold mine in Alaska
Aviation MRO Case Study: 75% Faster Wing Inspections75% Faster inspectionsa European airline maintenance operation
How a Historic Renovation Saved 456 Labor Hours With Demolition Robots456 hrs labor saveda New England demolition contractor renovating a historic civic building
Oil Refinery Tank Inspection: $3 Million Saved and 2,900+ Hours Removed$3 million Documented savingsa major refinery operating a 217-foot jet-fuel tank
Hotel Pool Cleaning Reclaimed About 112 Labor Hours Monthly112 hrs/mo labor saved monthlya 293-room urban hotel in Southeast Asia
University Library Stores 2 Million Items in One-Ninth the Space2 million items storeda U.S. research university library
Quick-Service Fry Station Case Study: 15 to 25% Faster Orders15-25% faster order timesa short-staffed suburban quick-service restaurant in Illinois
Brewery Case Study: Quadruped Inspection Cut Repair Time to 13 Days13 days average repair timea high-volume European brewery with ten packaging lines
Boiler Inspection Found 65+ Wasted Tubes Within One Outage65+ severely wasted tubesa West Virginia power plant with recurring forced outages
Ceiling Crawlers Cut Hatch Openings by More Than Tenfold10x+ fewer hatches openeda major Southeast Asian hub airport with kilometers of concealed cabling
Find the robot that fits your site.
Free simulation. We tell you what actually works before you spend a dollar.
